This design & construct project with SINSW & school representatives was in a very tight part of the site, only accessible if the grounds were dry.
With limited access & tight construction zones this was a challenging build.
The 3 external lifts were built in the main thoroughfare for all buildings.
The majority of works were constructed through main entry linking all buildings.