This design & construct project with SINSW & school representatives was in a very tight part of the site, with access being via the adjoining council land only accessible if the grounds were dry. With limited access & tight construction zone this was a challenging build, with the 1st floor linkway joining 2 building approximately 30m apart. The majority of works were constructed through main entry linking all buildings.