With a project team of architects, engineers, accessibility consultants, SINSW & a school representative - this was always going to be a challenge in an occupied site.
With limited access & working hour constraints enforced, this was both a difficult yet rewarding project. The result - an additional structure constructed to link 2 of the existing buildings to the front entry to the school.
All works were constructed through amain thoroughfare linking all buildings.
Works Included: